(Summary description) The hydraulic vibration hammer produced by the construction site pile driver manufacturer is mainly composed of four parts:
The composition of the hydraulic vibration hammer produced by the construction site pile driver manufacturer
(Summary description) The hydraulic vibration hammer produced by the construction site pile driver manufacturer is mainly composed of four parts:
- Categories:Industry News
- Author:
- Origin:http://www.zh-sanmi.com
- Time of issue:2020-11-26
- Views:0
The hydraulic vibration hammer produced by the construction site pile driver manufacturer is mainly composed of four parts:
(1) Boom assembly: The boom assembly system can carry 7 oil pipes: 1-inch motor oil inlet pipe, 1.2-inch motor oil return pipe, 6-point motor oil discharge pipe, 3 points for two simultaneous clamping and oil cylinder for in and out The oil pipes, 3 points and 2 pipes have hydraulic pressure and act as the oil inlet and outlet pipes by rotating a motor. The overall structure of the boom assembly is made of Q345B. The pipeline mainly uses cold drawn seamless pipes. Whether the designed boom arc is appropriate and the pipeline layout is reasonable.
(2) Big hanger assembly: The big hanger assembly is the largest part of the hydraulic vibrating hammer. The large hanger has been quenched to make it have higher hardness and strong earthquake resistance. There are 8 hydraulic rotating motors, 9 oil valve blocks, 10 rotating gear plates, and 11 boom connecting frames in the large hanger.
(3) The main assembly of the vibratory hammer box body: the box body design assembly system is divided into an outer box body assembly and an inner box body assembly. The internal environment of the outer box assembly is well arranged, the shock-proof rubber pad is analyzed and a series of reinforcements are analyzed, and the network connection is made through the connecting pin and the large hanger. The outer box assembly is also assembled through the information processing quality inspection through quenching technology.
(4) Chuck assembly
The chuck assembly system is divided into two important parts: the integral casting assembly and the clamping cylinder. The high-quality steel market selected for the integral casting is developed and casted as a whole, which is more durable and has a longer network life. The hydraulic cylinders produced by the construction site pile driver manufacturers have better working ability and unique clamping scheme design, which can clamp the steel sheet piles tighter and tighter during the process of clamping the steel sheet piles, reducing the safety risk accidents caused by the slipping of the steel sheet piles.
A brief description of the construction site pile driver manufacturer on the hydraulic vibration hammer pulling pile construction:
The main development characteristics of hydraulic system vibratory hammer parameters include: eccentric torque, vibration and weight, no-load amplitude, maximum excitation force, etc. First, there should be a power station. The hydraulic pump is driven by the engine. The hydraulic oil in the hydraulic cylinder is pressurized by the hydraulic pump and delivered to the hammer head through the high-pressure tubing. The mechanical energy is converted into the internal energy of the hydraulic oil, and the eccentric block in the gear box is driven to rotate at a high speed. The internal energy of the oil is converted into mechanical energy to drive the vibration of the hammer body and the pile to realize the piling operation.
Scan the QR code to read on your phone
Relevant news


Steel sheet pile machine manufacturers: What are the misunderstandings of pile driver maintenance?

Steel sheet pile machine manufacturers: introduction to the piling steps and electricity issues of the pile driver

Steel sheet pile machine manufacturers: Which operations of the pile driver are incorrect?
Online Message