Construction site pile driver manufacturer: Precautions for the use of pile driver

Construction site pile driver manufacturer: Precautions for the use of pile driver

  • Categories:Industry News
  • Author:
  • Origin:www.zh-sanmi.com
  • Time of issue:2021-02-18
  • Views:0

(Summary description)Construction site pile driver manufacturers: pile drivers can often be seen on the construction site. For such large equipment, there will be many requirements when operating, not only to ensure the normal use of the equipment, but also to ensure the safety of the operators , Xiaobian sorted out some important precautions for the safe operation of the pile driver.

Construction site pile driver manufacturer: Precautions for the use of pile driver

(Summary description)Construction site pile driver manufacturers: pile drivers can often be seen on the construction site. For such large equipment, there will be many requirements when operating, not only to ensure the normal use of the equipment, but also to ensure the safety of the operators , Xiaobian sorted out some important precautions for the safe operation of the pile driver.

  • Categories:Industry News
  • Author:
  • Origin:www.zh-sanmi.com
  • Time of issue:2021-02-18
  • Views:0
Information

Precautions

Construction site pile driver manufacturers: pile drivers can often be seen on the construction site. For such large equipment, there will be many requirements when operating, not only to ensure the normal use of the equipment, but also to ensure the safety of the operators , Xiaobian sorted out some important precautions for the safe operation of the pile driver.

1. The power device, hoist, hydraulic device and electrical device of the pile driver shall be operated in accordance with its instruction manual.

2. Operators should undergo special training to be familiar with the performance, structure, use, and maintenance methods of the equipment they operate. They can only operate after holding an operating certificate.

3. Before operation, a comprehensive understanding of the surrounding environment, buildings and geological conditions of the work site should be conducted.

4. The assembly, test run, and disassembly of the pile driver should follow the procedures specified in the instruction manual.

 

打桩机

5. Construction site piling machine manufacturer: In case of severe weather such as strong wind or heavy rain, heavy snow and heavy fog above grade 6, the operation should be stopped. When the wind force is greater than seven, the pile driver should be parked in the wind direction, the diesel hammer should be lowered, and wind-proof cables should be added, and the pile frame should be put down if necessary. The equipment should have lightning protection measures, and personnel should stay away from it in case of lightning.

6. The wire rope should be fixed with wedge-shaped joints, pressure plates, rope clamps, compression joints, or braided joints corresponding to the diameter of the wire rope. When the wire rope is fixed by braiding, the length of the braided part should not be less than 20 times the diameter of the wire rope, and should not be less than 300mm, and the braided part should be bundled with thin steel wires. When the rope clamp is used for fixing, the number of rope clamps should not be less than 3, the number of rope clamps is related to the diameter of the wire rope; the distance between the rope clamps should not be less than 6 times the diameter of the wire rope, and the distance between the rope head and the rope clamp should not be less than 140mm, The rope clamp holder should be placed on the side of the wire rope that is stressed when working, and the U-shaped bolt should be fastened to the end of the wire rope. The rope clamp should not be staggered and tightened after the wire rope is stressed.

7. When installing the diesel hammer, the diesel hammer should be transported to within 2m directly in front of the guide of the pile frame.

8. When working at heights, operators should wear safety belts.

9. Construction site pile driver manufacturer: When the pile driver is operating, no one is allowed to enter under the raised diesel hammer.

Scan the QR code to read on your phone

Relevant news

What

What are the characteristics of the piling boom?

Pile-driving arm manufacturers: characteristics of pile-driving arm 1. The pile-driving arm is fully hydraulically driven and can be rotated 180 degrees left and right, and the operation is simple; 2. It is convenient to transport and can be integrated with the excavator; 3. The piling arm can be applied to various work sites, and can also be used in riverside, water surface, and underwater operations on rainy days; 4. Steel piles, cement piles, steel rail columns, iron plates, H plates, and drainage belts that can be driven and moved; 5. Pile-driving arm manufacturers: using German original hydraulic motor drive (rotating motor and vibration motor), small size, light weight, but can output high power and high speed, high reliability, sturdy and durable; 6. The advanced oil circuit design enables the jamming and vibration to be carried out simultaneously, which improves the efficiency of driving and piling, and better protects the main oil system of the excavator. The newly designed safety device makes the chuck the safety device when the vibration operation occurs. Automatic tightening, no loosening of the pile board, high stability and efficiency; 7. The pile-driving arm adopts cylindrical stick bearings imported from Japan, which has low noise, high speed and high reliability, and the quality of the whole machine is better; 8. When driving and pulling piles, the speed and vibration frequency can be adjusted to meet the requirements of different working environments; 9. Optimize the design of the device to protect the two ends of the pile against damage, and work in close proximity to the building will not damage the building itself; 10. The pile-driving arm adopts well-known brand shock absorbers to reduce vibration and noise, which is more in line with environmental protection requirements and improves the long-term reliability of the machine. Pile-driving arm manufacturers: For underwater operations, an additional exhaust pipe is required.
2021-04-25
Steel

Steel sheet pile machine manufacturers: What are the misunderstandings of pile driver maintenance?

Steel sheet pile machine manufacturers: introduction to the maintenance misunderstandings of pile drivers Misunderstanding 1: Improper starting method of pile driver The serious consequences that a 360° rotating pile driver can cause: serious damage to the machine. In winter, some drivers often start the diesel engine without water (start first, then add cooling water) to start the diesel engine abnormally. This practice can cause serious damage to the machine, and its use should be prohibited. The correct preheating method is: first cover the heat preservation quilt on the water tank, open the drain valve, and continuously pour 60-70℃ clean and soft water into the water tank, and then close the drain valve when you touch the water flowing out of the drain valve with your hands and feel hot. Fill the water tank with clean and soft water at 90-100°C, and shake the crankshaft so that all moving parts are properly pre-lubricated before starting.   Misunderstanding 2: Low temperature load operation of pile driver The serious consequences that can be triggered: cause serious wear and tear of the machine. Steel sheet pile machine manufacturers: After the diesel engine started to catch fire, some drivers couldn't wait to put into load work immediately. Diesel engines that catch fire soon, due to the low body temperature and high oil viscosity, the oil is not easy to fill the friction surface of the moving pair, which will cause serious machine wear. In addition, plunger springs, valve springs and injector springs are also prone to breakage due to "cold brittleness". Therefore, after the diesel engine starts to catch fire in winter, it should be idling for a few minutes at low and medium speed, and then put into load operation when the cooling water temperature reaches 60°C. Misunderstanding 3: Do not pay attention to the heat preservation of the pile driver Serious consequences that can be triggered: reduced working life and damage to the engine. Steel sheet pile machine manufacturers: The low temperature in winter can easily cause excessive cooling of the equipment during operation. Therefore, heat preservation is the key to good use of the machine in winter. In the northern regions, all machines used in winter should be equipped with cold-proof equipment such as insulation sleeves and insulation curtains. In addition, the thermostat plays an important role in increasing the temperature of the pile driver. Therefore, check whether the thermostat is working properly before entering the winter, and replace the failed thermostat in time.
2021-04-22
Steel

Steel sheet pile machine manufacturers: introduction to the piling steps and electricity issues of the pile driver

Steel sheet pile driver manufacturers: The common pile drivers on the market are mainly based on mechanical power, which are usually divided into hammering method, oscillation method and static pile pressing method; after the pile driver enters the construction site, it will be based on the site's topographical conditions and the condition of the foundation soil. Factors such as the placement of the piles, the length of the piles and the ease of movement of the pile frame determine the sequence of pile driving, so that the depth of the piles is basically the same, and the foundation soil is evenly compacted. If there are not many piles, the pile driver should start from the center and move in opposite directions from the two ends. However, when the pile foundation area is large, the pile foundation should be divided into several sections and then carried out separately within the range of each section; hydraulic pile drivers should prevent From the outside to the inside, or from the periphery to the center, prevent the foundation soil in the middle of the pile foundation from being compacted, and increase the difficulty of driving. Even if the driving is forced, the driven neighboring piles will rise up; in the clay area, It is also necessary to prevent it from being carried out in one direction, causing the soil to knead to one side, forming piles into the soil with different depths, uneven soil density, and uneven settlement of the entire pile foundation in the future; if the pile distance is greater than or equal to 4 times In the case of pile diameter or side length, the impact of the piling sequence is smaller, but if it is an area group pile, the piling sequence must be planned in advance to prevent adverse consequences or safety accidents.   钢板桩机厂家:打桩机用电事项        我们在用电的时候要安置专门的开关和开关箱里面要有漏电和短路维护的电器设备。小型打桩机和开关柜设置的维护。我们如果在晚上工作的时候要保证一定的安全和充足的照明,我们的照明工具一定要符合国家标准的规则。不允许用绝缘体,我们如果遇到短路和突然停电时我们的工作人员要及时的撤离工作地点,要及时的自备电源和应急的照明设备保证安全。        钢板桩机厂家:我们在工程施工现场用电敷设应选用电缆,暂时用电线路的专项安全用电的需求,对经常需求移动的电缆线路,应设在不易被车辆轧、人踩及管材、工件碰撞的地方,且不得置于泥土和水中。电工每周至少有必要停电查看一次电缆外层磨损状况,发现问题有必要及时处理。
2021-04-09
Steel

Steel sheet pile machine manufacturers: Which operations of the pile driver are incorrect?

Steel sheet pile machine manufacturers: Abrasion and failure during the construction of pile drivers are normal. If the operator performs incorrect operations on the equipment, it will also affect its use, accelerate the wear of parts, and shorten the service life.
2021-03-25

Online Message

Username used for comment:
客户留言
Description:
验证码

CONTACT

Fax:0756--5581005

E-mail:13640692955@163.com

森美机械

Zhuhai SenMei Machinery Technology Co., Ltd  Powered by 300.cn    粤ICP备19149533号